|
Water Rates -- Commercial and Industrial
Rates effective October 1, 2005
Inside City Limits
Rate per month:
First 3,000 gallons: $0.4431 per 100 gallons
Next 12,000 gallons: $0.3039 per 100 gallons
Next 185,000 gallons: $0.2348 per 100 gallons
Next 300,000 gallons: $0.1503 per 100 gallons
Next 500,000 gallons: $0.1306 per 100 gallons
Excess over 1,000,000 gallons: $0.0943 per 100 gallons
Minimum Monthly Bill:
5/8-inch meter: $13.29
1-inch meter: $20.61
1 1/2-inch meter: $32.20
2-inch meter: $61.18
3-inch meter: $119.20
4-inch meter: $177.25
6-inch meter: $351.32
8-inch meter: $583.41
Outside City Limits
Rate per month:
First 3,000 gallons: $0.5905 per 100 gallons
Next 12,000 gallons: $0.3960 per 100 gallons
Next 185,000 gallons: $0.2567 per 100 gallons
Next 300,000 gallons: $0.1876 per 100 gallons
Next 500,000 gallons: $0.1612 per 100 gallons
Excess over 1,000,000 gallons: $0.1207 per 100 gallons
Minimum Monthly Bill:
5/8-inch meter: $17.71
1-inch meter: $26.39
1 1/2-inch meter: $37.98
2-inch meter: $72.83
3-inch meter: $142.41
4-inch meter: $235.28
6-inch meter: $467.35
8-inch meter: $699.43
Fire Sprinkler Connection
Fee
The Jackson Energy Authority charges a connection
fee for buildings with separate fire protection sprinkler systems. The
cost is based on the size of the service line:
2- to 4-inch line: $917.
6-inch line: $1,978.
8-inch line: $3,366.
10-inch line: $5,024.
12-inch line: $6,895.
16-inch line: $11,656.
Water Installation Fees
The size of your meter and service line to our
main is based on the number of gallons of water you need per minute.
Water main development fee: $14.50 a foot
to the property (if required) and $14.50 a foot across the front of the
property.
Service connection fee from our main to the property
line for a typical commercial water service:
Inside City Limits:
3/4-inch meter: $580
1-inch meter: $900
1 1/2-inch meter: $1,600
2-inch meter: $2,000
Outside City Limits:
3/4-inch meter: $780
1-inch meter: $1,100
1 1/2-inch meter: $1,800
2-inch meter: $2,200
Developer Installed:
3/4-inch meter: $400
1-inch meter: $700
1 1/2-inch meter: $1,300
2-inch meter: $1,500
Connection fee for above 2-inch service is based
on actual cost.
Jackson Energy Authority can connect services
after a JEA application and City plumbing permit are matched.
|