Jackson Energy Authority - One Thing You Can Count On.
Call Before You Dig! The "E" Guarantee EPlusTV6 Eplus Broadband!
home manage account jea jobs contact us site map
 

Water Rates -- Commercial and Industrial

Rates effective October 1, 2005

Inside City Limits

Rate per month:
First 3,000 gallons: $0.4431 per 100 gallons
Next 12,000 gallons: $0.3039 per 100 gallons
Next 185,000 gallons: $0.2348 per 100 gallons
Next 300,000 gallons: $0.1503 per 100 gallons
Next 500,000 gallons: $0.1306 per 100 gallons
Excess over 1,000,000 gallons: $0.0943 per 100 gallons

Minimum Monthly Bill:
5/8-inch meter: $13.29
1-inch meter: $20.61
1 1/2-inch meter: $32.20
2-inch meter: $61.18
3-inch meter: $119.20
4-inch meter: $177.25
6-inch meter: $351.32
8-inch meter: $583.41


Outside City Limits

Rate per month:
First 3,000 gallons: $0.5905 per 100 gallons
Next 12,000 gallons: $0.3960 per 100 gallons
Next 185,000 gallons: $0.2567 per 100 gallons
Next 300,000 gallons: $0.1876 per 100 gallons
Next 500,000 gallons: $0.1612 per 100 gallons
Excess over 1,000,000 gallons: $0.1207 per 100 gallons


Minimum Monthly Bill:
5/8-inch meter: $17.71
1-inch meter: $26.39
1 1/2-inch meter: $37.98
2-inch meter: $72.83
3-inch meter: $142.41
4-inch meter: $235.28
6-inch meter: $467.35
8-inch meter: $699.43

Fire Sprinkler Connection Fee

The Jackson Energy Authority charges a connection fee for buildings with separate fire protection sprinkler systems. The cost is based on the size of the service line:

2- to 4-inch line: $917.
6-inch line: $1,978.
8-inch line: $3,366.
10-inch line: $5,024.
12-inch line: $6,895.
16-inch line: $11,656.


Water Installation Fees

The size of your meter and service line to our main is based on the number of gallons of water you need per minute.

Water main development fee: $14.50 a foot to the property (if required) and $14.50 a foot across the front of the property.

Service connection fee from our main to the property line for a typical commercial water service:

Inside City Limits:
3/4-inch meter: $580
1-inch meter: $900
1 1/2-inch meter: $1,600
2-inch meter: $2,000

Outside City Limits:
3/4-inch meter: $780
1-inch meter: $1,100
1 1/2-inch meter: $1,800
2-inch meter: $2,200

Developer Installed:
3/4-inch meter: $400
1-inch meter: $700
1 1/2-inch meter: $1,300
2-inch meter: $1,500

Connection fee for above 2-inch service is based on actual cost.

Jackson Energy Authority can connect services after a JEA application and City plumbing permit are matched.